NEW QUESTION 37
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. You should delete collections after they have been transported.
  • B. A planning area with its time profile must be bundled in one collection.
  • C. A planning area with the copy operators assigned must be bundled in one collection.
  • D. Configuration items should be bundled in the collections based on the SAP IBP project stream.

Answer: B,C

 

NEW QUESTION 38
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.

  • A. Identifiy intermittent demand for Forecast Error CV calculations
  • B. Adjust Safety Stock Recommendations based on forecast error CV input
  • C. Propagate forecast error to upstream locations in a supply chain network
  • D. Adjust for forecast bias in Forecast Error CV calculations

Answer: B,D

 

NEW QUESTION 39
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.

  • A. Push and Pull production models are used by the optimizer.
  • B. Finite heuristics can achieve demand prioritization and pegging.
  • C. Planning results can be generated faster by the optimizer.
  • D. Prioritization of demand elements one by one is achieved by unconstrained heuristics.

Answer: A,B

 

NEW QUESTION 40
You are adding a value-based filter to a planning view. Which of the following conditions apply? Note:
There are 3 correct Answers to this question.

  • A. You can only apply one value-based filter per planning view.
  • B. These filters are always applied based on the values stored in the database.
  • C. These filters can be used together with attribute totals in the same planning view.
  • D. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • E. You can add (or delete) planning objects to a planning view after these filters are applied.

Answer: A,B,D

 

NEW QUESTION 41
What function would you use to configure a year-to-date calculation?

  • A. Cumulative Aggregation
  • B. Dynamic Rolling Aggregation
  • C. Last Period Aggregation
  • D. Rolling Aggregation

Answer: A

 

NEW QUESTION 42
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.

  • A. Using the realignment run to identify obsolete data
  • B. Merging two locations into a new location
  • C. Removing outliers from the sales history of a reference product before transferring its sales to a new product
  • D. Changing customer sources and reassigning customers to new DCs

Answer: B,D

 

NEW QUESTION 43
Which library is used by the forecasting engine for the demand sensing algorithm?

  • A. Supply chain algorithm library
  • B. Predictive analytics library
  • C. Demand library
  • D. Heuristics library

Answer: A

 

NEW QUESTION 44
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.

  • A. Disaggregation according to a user-defined expression
  • B. Disaggregation in batch triggered by an application job
  • C. Proportional disaggregation by using KF2 in the expression
  • D. Disaggregation according to a helper key figure
  • E. Disaggregation according to an equal split

Answer: A,C,E

 

NEW QUESTION 45
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note:
There are 2 correct answers to this question.

  • A. Demand Sensing with Gradient Boosting (Full)
  • B. Decoupling Points determination in SAP IBP for demand-driven replenishment
  • C. Charts creation in SAP Supply Chain Control Tower
  • D. Supply Heuristics in SAP IBP for sales and operations

Answer: A,D

 

NEW QUESTION 46
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed? Note: There are 2 correct Answers to this question.

  • A. Push and Pull production models are used by the optimizer.
  • B. Finite heuristics can achieve demand prioritization and pegging.
  • C. Planning results can be generated faster by the optimizer.
  • D. Prioritization of demand elements one by one is achieved by heuristics.

Answer: A,B

 

NEW QUESTION 47
What is a prerequisite for modeling outsourced manufacturers with production capacity?

  • A. Model target inventory and stocks at the outsourced location.
  • B. Use production lead times and offsets to manage components at the outsourced location.
  • C. Ensure that multiple modes of transportation are set up.
  • D. Model production costs for internal and external production resources to model priority.

Answer: D

 

NEW QUESTION 48
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

  • A. If necessary target key figures values are disaggregated.
  • B. Copying multiple key figures can be processed sequentially.
  • C. If necessary source key figures values are disaggregated.
  • D. Copying multiple key figures on different planning levels is not possible.

Answer: B,C

 

NEW QUESTION 49
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

  • A. Periodic lot size setting overrides the minimum lot size.
  • B. Lot sizes are time-independent master data settings.
  • C. Lot sizes are applicable for production and handling quantities.
  • D. Lot sizes are applicable for production and transportation quantities.

Answer: B,C

 

NEW QUESTION 50
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are
2 correct answers to this question.

  • A. The key figure is stored and all editable.
  • B. The key figure is calculated and system editable.
  • C. The key figure is calculated and all editable.
  • D. The key figure is stored and system editable.

Answer: A

 

NEW QUESTION 51
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Avoid using telescopic time buckets.
  • B. Use a subnetwork ID to reduce the size of the problem.
  • C. Increase the use of incremental lot size beyond the frozen horizon.
  • D. Split into multiple planning areas to support weekly vs. daily planning needs.

Answer: A,B

 

NEW QUESTION 52
Which supply chain challenge is addressed by SAP IBP for demand?

  • A. Inability to synchronize supply and demand
  • B. Inability to respond to short-term changes in supply and demand
  • C. Inability to arrive at consensus demand
  • D. Inability to understand and shape actual demand

Answer: D

 

NEW QUESTION 53
What are S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery
  • B. You want to copy a custom planning area that was built during the SAP IBP implementation to model a separate process.
  • C. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
  • D. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
  • E. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery

Answer: A

 

NEW QUESTION 54
......