[Nov-2021 Newly Released] E-S4HCON2022 Dumps for SAP Certified Technology Specialist Certified [Q11-Q36]

Share

[Nov-2021 Newly Released] E-S4HCON2022 Dumps for SAP Certified Technology Specialist Certified

Updated Verified E-S4HCON2022 dumps Q&As - 100% Pass


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Details:

Passing ScoreE_S4HCON2022 - 65%
E_S4HCON2020 - 68%
LevelAssociate
Exam CodeE_S4HCON2022
Exam NameSAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Schedule ExamSAP Training
Exam Price$550 (USD)

 

NEW QUESTION 11
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can find the optimal number of parallel R31oad processes by monitoring host performance.
  • B. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can verify that the content of the download directory matches the stack.XML file.

Answer: A,C

 

NEW QUESTION 12
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phase RUN_RSDBSCPY
  • B. Phases EU_IMPORT*
  • C. Phases DIFF*
  • D. Phase DOWNCONF_DTTRANS
  • E. Phase RUN_RSPTBFIL _ISUTABU

Answer: B,C,D

 

NEW QUESTION 13
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • B. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • C. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
  • D. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

Answer: A

 

NEW QUESTION 14
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SYCM (Simplification Database Content)
  • B. ATC (ABAP Test Cockpit)
  • C. SAT (Runtime Analysis)
  • D. SE80 (Object Navigator)

Answer: B,D

 

NEW QUESTION 15
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • B. Check for running R3trans processes on the host of the primary application server
  • C. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • D. Check for running R31oad processes on the host of the primary application server

Answer: A,B

 

NEW QUESTION 16
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as In the start release
  • B. Before continuing with the next phase SUM asks for a modification adjustment transport
  • C. SUM continues with the next phase and your modifications are lost
  • D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport

Answer: A

 

NEW QUESTION 17
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Specify the business functions that need to be switched on during the prepare part of SUM.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Activate the required business functions manually in the production system.
  • D. Import a transport request from the development system that contains the recording of the activation.

Answer: B,D

 

NEW QUESTION 18
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Apply SAP Support Packages.
  • B. Use DMO for SUM.
  • C. Upgrade the SAP system.
  • D. Apply an Enhancement Package.
  • E. Perform an SAP S/4HANA conversion including DMO.

Answer: A,C,D

 

NEW QUESTION 19
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the corresponding R3trans log files of this phase
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • C. In the job log for the corresponding job in SM37 (Job Overview)
  • D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log

Answer: C,D

 

NEW QUESTION 20
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. The source system is non-Unicode and the target database is a scale-out system.
  • E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

Answer: A,E

 

NEW QUESTION 21
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the database migration option (DMO) for SUM
  • C. Using the main configuration option "Standard" when applying SAP Support Packages
  • D. Using the main configuration option "Single System" when installing an Add-On

Answer: D

 

NEW QUESTION 22
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Stack XML file calculated by the Maintenance Planner
  • B. Breakpoint configuration file SAPUPPHAS.BRK
  • C. Parameter file SAPup_add.par
  • D. MIGRATE J5T_DUR_XML file from a previous run

Answer: A,D

 

NEW QUESTION 23
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of upgrade and language data from the download directory in phase TABIM UPG
  • B. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Import of dictionary objects from the download directory in phase DDIC_UPG
  • E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

Answer: A,C,D

 

NEW QUESTION 24
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Homogenous system copy
  • B. Support Package Stack update
  • C. Release upgrade
  • D. Database migration
  • E. Dual Stack split

Answer: B,C,D

 

NEW QUESTION 25
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. AA
  • B. The link to different patch levels to SUM
  • C. An overview about possible upgrade paths
  • D. The corrections to the SUM Guide

Answer: B,C,D

 

NEW QUESTION 26
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. AA
  • B. An SAP S4HANA 1709 sandbox system
  • C. A Standalone SAP system with ABAP 7.51 or above

Answer: B,C

 

NEW QUESTION 27
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests that are assigned to the project SAP_ADJUST
  • B. By searching for transport requests named <SID>K0<number>
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests in DIR_TRANS, subdirectory "transport"

Answer: C

 

NEW QUESTION 28
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Apply the recommendations of the simplification list
  • C. Run the database migration to the SAP HANA database
  • D. Perform the migration of data into the new data structure

Answer: A,B

 

NEW QUESTION 29
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To repeat specific phases during the SUM run
  • B. To auto-fill specific fields on selected screens on the SUM UI
  • C. To skip selected phases during the SUM run
  • D. To make the progress information within SUM UI more accurate

Answer: D

 

NEW QUESTION 30
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of eCATTs for business validation tests
  • B. Execution of SPDD modification adjustment
  • C. Creation of the table structures in the new SAP HANA database
  • D. Execution of XPRAs and AIMs
  • E. Execution of SPAU modification adjustment

Answer: A,D,E

 

NEW QUESTION 31
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
  • B. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
  • C. /ASU/START (Start ASU Toolbox)
  • D. /ASU/SSM (ASU Simple Schedule Manager)

Answer: C

 

NEW QUESTION 32
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Configure it within transaction ATC
  • B. Apply the corresponding SAP note via SAP Note Assistant
  • C. Download it from SAP Support Portal
  • D. Generate it by analyzing the specific custom code via RFC

Answer: C

 

NEW QUESTION 33
......


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
Manual Activities for SUMDescribe the necessary manual preparation and follow-on activities for SUM

ADM328

8% - 12%
Handling of an SAP System LandscapeDescribe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade

ADM328

8% - 12%
Modification AdjustmentPerform the modification adjustment with SPDD and SPAU

ADM328

8% - 12%
SUM Monitoring and TroubleshootingMonitor and troubleshoot the SUM procedure

ADM328

8% - 12%

 

Latest E-S4HCON2022 Exam Dumps SAP Exam from Training: https://exams4sure.pass4sures.top/SAP-Certified-Technology-Specialist/E-S4HCON2022-testking-braindumps.html